Briagolong was one of four projects awarded to Kubale Constructions by DEWLP as part of a facilities upgrade in East Gippsland for their fire-fighting fleet. This site was designed to facilitate the storage and maintenance of their new Unimog and G-Wagon vehicles.

After demolition of the existing buildings was complete, significant civil works were undertaken on the road and drainage including asphalt and curbing. New buildings of approximately 880 sqr metres were erected on slabs using conventional steel portal frames and clad with Colourbond. Individual bays were built for each vehicle with an industrial wash-down bay at the end with vacuum equipment. Sitting aside from the main building is a smaller dangerous goods storage shed.

The contract included a full security upgrade to the site including access control, CCTV and the installation of large, industrial palisade sliding gates to complete the secure enclosure.

This project was handed over within budget and on time to a satisfied client.

Construction Techniques Employed
  • Portal steel frame with Colorbond cladding
  • Significant civil component including drainage, asphalt and curbing
  • Full security upgrade to secure the site

"I am writing to provide positive feedback for the workmanship and the professional work you and your team are doing on site. Specifically, you’ve done an excellent job in Morwell and the engineers have no comments or concerns for the slab works."

Name withheld – project in progress
Superintendent Representative
,

"Dear Kubale Constructions, we want to say thanks for everything you’ve done over the past year. We are thrilled with the end product which is a credit to you and your crew. If anyone is ever after a reference, please give them my number!"

Andy
Private Client
,

"I would highly recommend Kubale Constructions for any large or technical building project. Their experience, professionalism and communication make working with and managing their contract simple and frustration free.”

Senior Project Engineer
, Baw Baw Shire

"Thank you for your excellent problem solving skills and advocacy for us during the build. Thank you especially for your negotiations with the authorities and engineer on our behalf. What would usually takes weeks or month, you achieved in days or hours."

Daniel
Private Developer
,
  
, Dept. of Environment, Land, Water & Planning