Prior to construction, staff demolished existing facilities and cleared the site. Our contract was to construct over 500 square metres of new administration building (within an operational site). The design included staff rooms, a reception area with feature lighting, kitchenette, joinery, toilets, and several multipurpose rooms with custom pin boards.
The scope of works included a minimal landscaping package with large curved, aerated polished concrete blockwork forming s-shaped seating for students and staff. Site drainage was included within the existing civil context, and a covered connection between the new and existing buildings was constructed/completed.
- Steel framing with both steel and brick cladding
- Glazed face brickwork adjacent conventional bricks
- Aerated, curved and polished concrete landscaping blocks