Working within an operational education site, our most senior Site Manager began work to build a bespoke educational facility at the Seaford Park Primary School.
After the removal of portable rooms, the site was scratched clean, and a 1300 sq. metre raft slab was laid in the shape of the letter “Y” from an aerial view. A structural steel portal frame was then erected over the slab followed by a very complex 3D roof providing atrium lighting to the central hub.
Infill steel stud work was then built within the frame over which steel Colourbond cladding was applied. Given the purpose of the rooms, almost all internal linings provided superior acoustic properties including the ceilings. Rooms were divided by oversize sliding doors and openings completed with a double-glazed commercial aluminium window suite.
The scope included extensive joinery, a kitchen, and data cabling to finish. The site was handed over in time for the new school year and is now fully operational.
- Structural steel portal frame
- Acoustic linings throughout with double-glazing
- 1300m2 complex 3D roof in the shape of the letter “Y”